Deys Betontechniek B.V.

Giet- en ondersabelingsmortels,Betonreparatie producten, Injectieproducten, Kunststoffen, Mortelpompen, Voegovergang constructies

Deys Targets
  • Chemical-and petrochemical plants

  • Delta works

  • Sea Lock IJmuiden

  • Harbours

  • Industry

  • Offshore

  • Powerplants

  • Department of public works

  • Railways

  • Utility

  • Airports

  • Water treatment

  • Road and water construction

  • windmills

    Windturbines

BETEC 240

Description

BETEC 240 is a so-called non- (wet) shrinking moulding mortar based on Portland cement , which has been especially developed for areas which are difficult to reach and for larger surface areas. BETEC 240 is applied in constructions with heavy static and/or dynamic loads and heavy rotating equipment, as windturbines.

Type Grain structure [mm] Particulars
240 0-5  
     
Quality control

During manufacturing only high-quality aggregates are used, which meet the strictest requirements. During the production process as well as during the final stages these materials are extensively tested for quality, not only in our own laboratory, but also in independent acknowledged institutes.

Application areas Advantages
  • BETEC 240 is particularly suited for grouting large and heavy constructions which are to be put into operation again within a short period of time.
  • Grouting machines such as compressors, turbines large pumps etc
  • Grouting railway constructions, baseplates and anchors
  • Grouting bearings of bridges, fly-overs etc.
  • Grouting foundations which are heavily loaded like wind turbines
  • Product ready for use, which is easy to process and environment-friendly
  • Chromate reduced
  • Checked volume increase
  • No plastic shrinkage
  • Excellent fluidity characteristics
  • Very high early and final strengths, therefore loading is possible soon after application
  • Resistant to frost and gritting materials, like salt
  • Free of chlorides and other corrosive aggregates
  • Contains no aluminous cement
  • Complies with the requirements drawn up for prestressed concrete
  • Very good adhesion to concrete and steel
  • Highly resistant to oil and grease
  • Can be pumped, vibrated or poured without any danger of de-mixing
  • By adding microsilica a highly dense and homogenous mortar matrix and extremely low permeability are realisedmortar matrix and

••••

Packaging and storage
25 kg bags. Dry and frostproof.Storage life 12 months in the original and closed packaging.
Precautions
Refer to safety sheets
Article Number 240
Kind of mortar moulding mortar
Type of mortar (mm) 5
Moulding height (mm) vanaf 25 mm
Class of strength C90/105
Environmental degree xo t/m xa3
Volume increase (%) > 0.1 en < 2.0
Yield measurement (mm)  
 • after 5 minutes ≥,780
 • after 30 minutes ≥,700 (!)
Desiccation shrinkage after 7 days (mm/m) 0.86
(measurement of shrinkage on experimental patches that received  
Water segregation (bleeding) none
Min. processing temperature (ºC) xx 5
Max. processing temperature (ºC) 35
Rel. humidity foundation soil moderately damp
Bond strength to concrete (N/mm2) >2
Water dosage refer to front of package
E-module (N/mm2) 35700
Calculation of amount of dry mortar (kg/m3) 2100
Density of mixed mortar (kg/dm3) 2.34
Compressive strength (N/mm2)(20ºC)  
 • 1 day 70.0
 • 7 days 91.0
 • 28 days 116.0
 • 56 days 124.0
 • 90 days 127.0
Strength class C 90/105
Flexural-tensile strength (N/mm2) (20ºC)  
 • 1 day 10.0
 • 7 days 14.0
 • 28 days 16.0
Processing advice
General Processing Advice Moulding mortar (cement-bound) [A]

Liability

The technical instructions and recommendations we provide on the basis of our experience and to the best of our knowledge, are entirely without obligation and merely provide an indication. Not all facts, problems and queries that occur during practical application can be included in a general documentation sheet. Our recommendations and instructions do not commit us to any legal obligations as a result of the purchase and application of our products. Any deviating agreements made by our employees that are not included in our datasheets will only be lawful providing they have been confirmed in writing by the management. Our raw materials, semi-finished products and products comply with the most stringent quality standards. This does not relieve the user of their responsibility to test our products prior to their application. Our general trading and delivery conditions, which we are happy to forward to you on demand, are and remain applicable at all times.
This specification sheet supersedes any previous versions.