Deys Betontechniek B.V.

Giet- en ondersabelingsmortels,Betonreparatie producten, Injectieproducten, Kunststoffen, Mortelpompen, Voegovergang constructies

Deys Targets
  • Chemical-and petrochemical plants

  • Delta works

  • Sea Lock IJmuiden

  • Harbours

  • Industry

  • Offshore

  • Powerplants

  • Department of public works

  • Railways

  • Utility

  • Airports

  • Water treatment

  • Road and water construction

  • windmills

    Windturbines

BETEC 01 / 04 / 08

Description

BETEC 01, 04 and 08 are so-called non- (wet) shrinking moulding mortars based on Portland cement, favourably priced and applied for various foundations.

TypeGrain structure [mm]Particulars
010-1 
040-4 
080-8 
Quality control

During manufacturing only high-quality aggregates are used, which meet the strictest requirements. During the production process as well as during the final stages these materials are extensively tested for quality, not only in our own laboratory, but also in independent acknowledged institutes.

Application areas Advantages
  • Injection, grouting prefab concrete constructions
  • Grouting steel constructions
  • Grouting holes, caps, machinery and such
  • Products ready for use, which are easy to process and environment-friendly
  • Chromate reduced
  • Checked volume increase
  • No plastic shrinkage
  • Excellent price-quality ratio
  • High early and final strengths
  • Resistant to frost and gritting material (salt)
  • High fluidity
  • Free of chlorides and other corrosive aggregates
  • Contain no aluminous cement
  • Comply with the requirements drawn up for prestressed concrete
  • Very good adhesion to concrete and steel
  • Highly resistant to oil and grease
  • Can be pumped, vibrated or poured without any danger of de-mixing
Packaging and storage
Bags of 25 kg. Dry and frostproof at least. Storage life 12 months.
Precautions
Refer to safety sheets
Article Code010408
Kind of mortarmoulding mortarmoulding mortarmoulding mortar
Type of Mortar [mm]148
Moulding height [mm]5-5020-20050-300
At armed constructions moulding height can change
Class of strengthK70K70K70
Evironmental degreexo t/m xa3xo t/m xa3xo t/m xa3
Volume increase [%]approx. 1.5approx. 1.5approx. 1.5
Yield measurement [mm]   
 • after 5 minutes≥,550≥,550≥,550
 • after 30 minutes≥,450≥,450≥,450
Desiccation shrinkage after 7 days [mm/m]0.650.600.55
(measurements of shrinkage on experimental patches that received no curing)   
Water segregation (bleeding)nonenonenone
Min. processing temp. [°C]555
Max. processing temp. [°C]353535
Rel. humidity foundation soilmoderately dampmoderately dampmoderately damp
Bond strength to concrete [N/mm²]> 2> 2> 2
Water dosagerefer to front of package
Heat resistancenot inflammable up to 800 °C
E-module [N/mm²]310003380034100
Calculation of amount of dry mortar [kg/m³]193019502100
Density of mixed mortar [kg/dm³]2.202.252.27
MPA freeze-thaw salt report Present 
Compressive strength [N/mm²] (20°C)   
 • 1 day46.049.040.0
 • 3 days54.062.056.0
 • 7 days77.077.073.0
 • 28 days95.094.089.0
 • 90 days101.098.093.0
Flexural-tensile strength [N/mm²] (20°C)   
 • 1 day5.04.55.5
 • 3 days7.06.57.5
 • 7 days8.58.08.5
 • 28 days10.09.59.5
 • 90 days11.010.510.5

 

Liability

The technical instructions and recommendations we provide on the basis of our experience and to the best of our knowledge, are entirely without obligation and merely provide an indication. Not all facts, problems and queries that occur during practical application can be included in a general documentation sheet. Our recommendations and instructions do not commit us to any legal obligations as a result of the purchase and application of our products. Any deviating agreements made by our employees that are not included in our datasheets will only be lawful providing they have been confirmed in writing by the management. Our raw materials, semi-finished products and products comply with the most stringent quality standards. This does not relieve the user of their responsibility to test our products prior to their application. Our general trading and delivery conditions, which we are happy to forward to you on demand, are and remain applicable at all times.
This specification sheet supersedes any previous versions.