BETEC 209

Description

BETEC 209 is a so called non- (wet) shrinking injecting/grouting mortar based on Portlandcement, which is favourably priced and applied for constructions carrying loads of light, medium and heavy weight and for unterwater injections

TypeGrain structure (mm)Particulars
2090-0.3Excellent for injecting or grouting
Quality control

During manufacturing only high-quality aggregates are used, which meet the strictest requirements. During the production process as well as during the final stages these materials are extensively tested for quality, not only in our own laboratory, but also in independent acknowledged institutes.

Application areas Advantages
  • Grouting mortar for prefab concrete constructions
  • Injecting mortar for ground anchors
  • Injecting, grouting mortar for baseplates
  • Injecting mortar for channels for prestressing steel
  • Injecting mortar for jack activities
  • Injecting mortar for hollow spaces below floors
  • Injecting mnortar for anchors/ concretesteel
  • Injecting mortar for brine pipes
  • Injection underwater constructions
  • Product ready for use, which is easy to process and environment-friendly
  • Chromate reduced
  • Checked volume increase
  • No plastic shrinkage
  • Excellent price-quality ratio
  • Good early and final strengths
  • Resistant to frost and gritting materials, like salt
  • High fluidity
  • Free of chlorides and other corrosive aggregates
  • Contains no aluminous cement
  • Complies with the requirements drawn up for prestressed concrete
  • Very good adhesion to concrete and steel
  • Highly resistant to oil and grease
  • Can be pumped, vibrated or poured without any danger of de-mixing
Packaging and storage
25 kg bags. Dry and frostproof, storage life 12 months in the original and closed packaging.
Precautions
Refer to safety sheets
Article code209
Kind of mortarInjecting/grouting mortar
Type of mortar [mm]< 0.3
Thickness of layer [mm]5-40
Class of strengthK50
Environmental degreexa3
Volume increase (%)approx 1.5
Yield measurement (mm) 
After 5 minutes700
After 30 minutes550
Desiccation shrinkage after 7 days (mm/m)0.65
(measurement of shrinkage on experimental patches that received no curing) 
Water segregation (bleeding)none
Min. processing temperature (ºC)5
Max. processing temperature (ºC)35
Processing time (minutes)50-70
Relative humidity foundation soilmoderately damp
Bond strength to concrete (N/mm²)>2
Water dosageRefer to front of package
Calculation of amount of dry mortar (kg/m³)1600
Density of mixed mortar (kg/m³)2.044
Compressive strength (N/mm²) (20ºC) 
 • 1 day40.0
 • 3 days47.5
 • 7 days63.0
 • 28 days80.0
 • 90 days91.0
Flexural-tensile strength (N/mm²) (20ºC) 
 • 1 day5.0
 • 3 days5.5
 • 7 days7.3
 • 28 days9.6
 • 90 days10.8

Complies with CUR recommendatiom 24.

Processing advice

General Processing Advice Moulding mortar (cement-bound) [A]

Preliminary treatment of the ground
Before BETEC moulding mortar is applied, the mineral ground should be freed of cement skin, dirt, grease, oil, dust, curing compound, paint residues, loose parts and other contaminants.
The ground should be roughened to such a degree that a good adhesion will be obtained. Roughening and removing cement skin of the mineral ground can be done by mechanical means such as spraying water under high pressure, grit blasting, dabbing, grinding or hacking (pneumatically, electrically, manually).

The mineral ground should be frost-free!

Pre-moistening of the ground
Highly absorbing grounds must be moistened with clean tap water until no more water is absorbed in ample time before the moulding mortar is applied. When applying the moulding mortar the ground should not be water-repellent (glistening wet); this will reduce adhesion. If the ground still shows too much water absorption, the adhesive surface will burn because of the low water-cement ratio. 
There are various options for additional adhesive layers, dependent on the surface and field of application; refer to our technical staff concerning this.

Mixing
BETEC moulding mortars can be mixed in a free-fall concrete mixer, forced mixer, Deys 200 groutautomatic or in case of smaller amounts with a plaster mixer for electric drilling machines. For the correct water dosage we refer to the front of the packaging, the minimum and maximum water dosages are mentioned there. The water dosage must not be below the minimum need for water, the maximum dosage must not be exceeded.
Fill the mixer with 2/3 of the water dosage indicated, then add the BETEC moulding mortar.
First mix thoroughly, so that a mixture free of lumps is produced. Then gradually add the remaining 1/3 of the mixing water until the correct consistence is realised; do not add any more water than strictly necessary.

  • Do not add water afterwards
  • Always use clean tap water, or suited mixing fluids delivered by us
  • The total mixing time amounts to a minimum of 3 minutes (approximately 3-5 minutes)
  • The processing time amounts to approximately 50-70 minutes (high-early-strength mortars approximately 10 minutes) (20° C)

Processing
When applying moulding mortar it is always important to work from one side or angle, so that no air can be enclosed. Therefore see to it there are always enough vents. Furthermore, the moulding mortar should be poured in one continuous stream without interruptions; this will produce the best result. For special applications refer to our technical staff. In so far the construction to be grouted is not square, grouting must always take place from the longest side. Dependent upon the size of the grouting, a filling funnel can be used, so that the construction will be fully grouted because of the hydrostatic pressure.
When grouting large constructions, the use of fully automated mortar/conveyance pumps may be considered.

  • Always use tight and non-porous molds
  • The minimum processing temperature of BETEC moulding mortars is 5° C; refer to our technical staff for the application in temperatures of + 5° C to -5° C concerning measures that should be taken during the winter.

Curing
As BETEC moulding mortars are cement-bound materials, it is of the greatest importance that the mortar is cured. Because of the low water-cement ratio the mortar must be cured for 5 days at the minimum, in order to prevent premature desiccation and ensuing shrinkage. This can be done by wetting the mortar with clean tap water. Another option is covering the mortar with moist burlap covered with synthetic foil. Less time-consuming is the application of BETEC BETOFILM curing compound which must be applied in two layers.
Curing activities should be started as soon as possible, but at the latest after the mortar surface has started hardening.

Packaging and storage
BETEC mortars are delivered in packages of 20/25 kg; packaging consists of several layers of paper, with layers of perforated synthetic material in between. The packaging material is not water-tight and must be stored in a dry and frost-free place. In the original closed packaging the storage life of the mortar is 12 months.

Health & Safety
BETEC® are products based on cement and can therefore cause burns to skin and eyes, which should be protected during use. Wear gloves and protective eye shields. Wearing a dust mask is advised. Treat splashes to eyes and skin immediately with clean drinking water. Consult a doctor when irritation continues. If accidentally ingested, drink water and consult a doctor. Users must comply with all risk and safety phrases. Safety data sheets can be obtained from Deys Betontechniek or from our website. GISCODE ZP1.

Liability

The technical instructions and recommendations we provide on the basis of our experience and to the best of our knowledge, are entirely without obligation and merely provide an indication. Not all facts, problems and queries that occur during practical application can be included in a general documentation sheet. Our recommendations and instructions do not commit us to any legal obligations as a result of the purchase and application of our products. Any deviating agreements made by our employees that are not included in our datasheets will only be lawful providing they have been confirmed in writing by the management. Our raw materials, semi-finished products and products comply with the most stringent quality standards. This does not relieve the user of their responsibility to test our products prior to their application. Our general trading and delivery conditions, which we are happy to forward to you on demand, are and remain applicable at all times.
This specification sheet supersedes any previous versions.